E614 (TWIST) Run
Information 10/13/2005-12/07/2005 |
You may find a list of initials helpful in reading the elog. |
|
Nominal Settings"Standard" settings for thresholds, HV's, beamline, etc.in various modes of operations: surface muons, pions, 1AT1 target scans, etc. Shutdown procedures prior to a maintenance day"Standard" procedures for the last person(s) on shift to followprior to a one to two day long shutdown. TECInstructionson how to turn on HV, run analysis, check histograms.DAQ and Slow ControlsHow to run DAQ, slow controls, Midas, Lazy Logger, StatusBar, etc.Includes information on recovering from software trouble, restarting things, etc. Also includes other DAQ-related software, like the CAMAC Mini-DAQ. M13 Beamline and EPICSInformation about M13 (TWIST's beamline), what's in it, and (especially) how to control it. For information on the proton beam (BL1A), see TN93.Online Analysis with Mofia and QODBasic instructions for shift people on using Mofia and QOD.Includes lists of histograms, and procedures for certain basis tasks such as finding the stopping distribution. Hardware DocumentationDealing with Hardware TroubleTWIST hardware databaseTWIST Software PageMiscellaneous Documentation
|
Run CoordinatorsPrevious 2005 Run Plans
Shift Responsibilities
Special Procedures
Run Summaries and Logs |
Maintained by Mina Nozar