Run Plan for the Week of November 1 to November 8, 2005 Updated by Ryan Bayes, on Nov 2, 2005 /-------------------------------------------------------- November 1 (Tuesday) (Suggested) -Finish the collimator run started last night -Remove collimators (Grant) The following is ment to deal with the accumulated M rate observed when the beam blocker is in -check gate valve and M13 VA3 for rates (?-HV off then open VA1 and WV) Try to understand the lost rate with the production target used for the completed data sets -Take ~1 TEC run (nominal beam) -change to position #2 on 1AT1 (first graphite target) -target scan if required(?) -measure the rates and take >1 TEC run. If we decide there is time -Establish CO2/He mixture to get muons to stopping target with the TEC in /--------------------------------------------------------- November 2 (Wednesday) Mainentance "day" begins -total station measurement of TEC in 2.04T magnetic field -check the decay of the activity in the beamline (-solutions?) -replace current T1 target ladder with the old (pre Oct 18) T1 target ladder -ramp to 2.0T /--------------------------------------------------------- November 3 (Thursday) Maintenance day continues *Beam returns in the evening* Reestablish CO2/He mixture to get muons to stopping target with the TEC in Start run with TEC+chambers /--------------------------------------------------------- November 4 (Friday) interrupt data set for bulge tests (Jingliang, evening) /--------------------------------------------------------- November 5 (Saturday) TEC in data set continued /--------------------------------------------------------- November 6 (Sunday) TEC in data set continued /--------------------------------------------------------- November 7 (Monday) TEC in data set concluded If more allignment data needed: -Ramp down -120 MeV/c allignment data /---------------------------------------------------------