Run Plan Updated on 24 Oct 2005 (by Ryan Bayes) ---------------------------------------------- Week 2 ====== 10/20/05 M13 Tune: Nominal tune to see if production target move helped. Ramp Solenoid: --------------------------------------------------------- 10/21/05 M13 Test Tunes: Test tunes in presence of solenoid field. Other items: TEC tests - Field wires free version will wait till early Dec. Temp. dependence of TEC Eff - after TEC temp. monitoring works. Alignment - Apertures at US/DS yoke ports wait till aperture ready. Dec? ------------------------------------------------------------------------- 10/22/05 Begin collecting 2.0T run data Note that we will be using settings with wider F0 slits and jaws to increase rate. (we lost about half of the current rate after the introduction of the current T1 graphite production target) F0 jaws 24.0 F0 slits 80.0 at -1.8 F1 slits 10.0 at -3.9 F2 jaws 20.0 F2 slits 12.0 at 1.6 This change allows us to collect between 250 and 300 runs by Monday -------------------------------------------------------------------------- 10/23/05 Continue with 2.0T data set -------------------------------------------------------------------------- 10/24/05 Finish the 2.0T data set reintroduce the TEC and re-characterise the beam Insert the 49 hole collimator to provide a callibration for the TEC --------------------------------------------------------------------------- 10/25/05 ramp the field to 1.96T (with TEC in)re-charactorise this beam with the TEC use 49 hole collimator to provide a callibration for the TEC remove the 49 hole collimator and charactorise the beam at 1.96T Start taking 1.96T data -------------------------------------------------------------------------- 10/26/05 Continue taking 1.96T data after the maintenance day (make sure to check that the beam did not change excessively by comparing the T1 prot. moniter values before and after the maintenance --------------------------------------------------------------------------- 10/27/05 Continue taking 1.96T data