M13 Operation - TWIST
Beamline Control
Beamline Information
  -  Overview of the M13
       beamline.
       
  
 -  Results of the 1 October 2002 scan of B2.
  
 - List of 
       M13 F1 absorber wheel positions
  
 -  Particle Times of Flight from
       1AT1 to the M scintillator, as a function of momentum.  (You
       can also use the perl program 
~e614/perl/tof.pl
       (read that file for usage instructions).)
       
  
 -  FYI, the M13 beamline is 8.369 metres from 1AT1 production target
       to the centre of Q7.  From a scale drawing of the TWIST front
       end, it is about 1.96 metres from the centre of Q7 to the M
       counter.
 
Back to the Run page.
Last updated 4 October, 2002 by Robert MacDonald.