Hi, The attached ps file contains transparencies to be presented at the collaboration meeting on September 14, 2001. Along with a brief summary of the status of the beam tube extension and related items, there are copies of drawings of the various parts of the assembly, including scintillator support, gas degrader, and film degrader. Glen -- Glen Marshall mailto:Glen.Marshall@triumf.ca TRIUMF, 4004 Wesbrook Mall phone: 604-222-7466 VANCOUVER, BC V6T 2A3 fax: 604-222-1074