TWIST System Information -- November 2001
DAQ Computers
The TWIST DAQ uses 4 computers,
-
E614VW 1- A VxWorks Power PC located in the Fastbus
crate 1 which collects the FBC1 data bank but is not readily accessible
to the user.
-
E614VW 2- A VxWorks Power PC located in the Fastbus
crate 2 which collects the FBC2 data bank but is not readily accessible
to the user.
-
E614SLOW - a Linux Pentium located on the floor
of the experiment all. The DVM for the gas system and the DVM for chamber
temperatures are connected to the RS232 ports of this computer
-
MIDTWIST - a Linux Pentium located in the counting room.
This is where the user interacts with the DAQ and analyses data. midtwist
is on the TWIST cluster.
Random Factoids
- The M13 beamline is 9.4 metres from 1AT1 production target to
the end of the beamsnout in the area. At present, it is 3.4
metres from the beamsnout to the scintillator just upstream of
TWIST.
Return to the 2001 Run page.