Weekend Run Plan - 4-6 October 2002 All runs with F0 slits at 41 mm and F0 jaws at 9 mm. 1. Redo stopping distribution scan for 0%, 5%, 10% CO2. 29.6 MeV/c. 6M events at each setting. 2. Redo part of well-upstream surface muon stops. 29.6 MeV/c. 24M events. Filmstrip degrader at 0.010" (position 8). Gas degrader at 30% CO2 (70% He). 3. Continue with slightly-downstream stops. 29.6 MeV/c. Total of 288M events. (As of 4pm 4 October, have ~202M.) No filmstrip degrader (position 1). Gas degrader at 0% CO2 (100% He). 4a. Slightly upstream surface muon stops. TALK TO ANDREI OR JIM. 29.6 MeV/c. Total of 288M events. No filmstrip degrader (position 1). Gas degrader setting at ??. 4b. Well-downstream cloud muon stop tuning. EXPERT SHIFT FOR GLEN.