|   GEANT 3 | 
    |
|   MOFIA | 
    
| Executable
name | 
      CVS tag
name | 
      Description/Modifications
since previous Executable | 
      Date
tagged | 
    
| photo_wg1.3 | 
      wg1_3 | 
      First tagged executable used
on Westgrid. | 
      |
| photo_wg1.4 | 
      wg1_3 | 
      Same MOFIA tag as photo_wg1.3
but YBOS was modified to fix a bug that caused MOFIA not to analyze
GEANT data file completely. | 
      |
| wg_g3_1 | 
      wg_g3_1 | 
      1. Write vertex information to
the banks. 2. Capability to read in geometry for 2003 target setup.  | 
      February 27, 2004 | 
    
| photo_wg1.6 | 
      wg1_6 | 
      1. Trigger times read from CFM. 2. Jim's Jan 2004 FG. 3. Modifications to trees: write out MC vertex information and delete some unused variables.  | 
      March 1, 2004 | 
    
| wg_g3_sp1 | 
      wg_g3_sp1 | 
      Special version based on
wg_g3_1 allowing a uniform field for positrons only. | 
      March 3, 2004 | 
    
| photo_wg1.7 | 
      wg1_7 | 
       Various updates to FG KO. See
      
this posting for more info.  | 
      March 9, 2004 | 
    
| wg_g3_sp2 | 
      wg_g3_sp2 | 
      Special version based on
wg_g3_1 with no DC or PC wires. | 
      March 9, 2004 | 
    
| wg_g3_2 | 
      wg_g3_2 | 
      1.Modified beam properties to
accomodate beam tales. See 
this posting for details. 2.Capability of using the 2003 target geometry (containing the pure Al target). 3.Various modifications to accommodate the TEC.  | 
      April 20, 2004 | 
    
| photo_wg1.8 | 
      wg1_8 | 
      Same as wg1_7 but
helixfit_mod.f90 was modified to gain speed when analyzing MC data with
a non-uniform field. | 
      April 30, 2004 | 
    
| photo_wg1.9 | 
      wg1_8-timecut | 
      Same as wg1_8 but allows a
time cut (default=700ns) following the muon trigger. This cut applies
when all event types are selected. | 
      May 19, 2004 | 
    
| wg_g3_3 | 
      wg_g3_3 | 
      1. Modification to beam
profile arrays. 2. Modification to include material definitions for downstream lucite.  | 
      May 31, 2004 | 
    
| wg_g3_4 | 
      wg_g3_4 | 
      Fixed bug which resulted in
the mce2 bank not getting written out if the last event is a pile-up
event. | 
      June 16, 2004 | 
    
| photo_wg2.3icc | 
      wg2_3 | 
      Many new changes including: 1. Modification to the classifications code. 2. Modifications to first guess. 3. Modifications to the helix fit to allow identification of backscatters.  | 
      June 10, 2004 | 
    
| wg_g3_5 | 
      wg_g3_5 | 
      Fixed bug for small rotation
of
detector with respect to magnetic field | 
      July 19, 2004 | 
    
| wg_g3_6 | wg_g3_6 | 
      Modified
for changing in positron beam profile | 
      |
| wg_g3_7 | 
      wg_g3_7 | 
      Modified
for more DSDK materials | 
      |
| wg_g3_8 | 
      wg_g3_8 | 
      Modified
for DC resolution study | 
      |
| wg_g3_9 | 
      wg_g3_9 | 
      Modified
for asymmetric DC/PC cells | 
      |
| 
      photo_rpm_050704 | 
      wg_rpm_050704 | 
      A few changes and bug fixes relating to tracking particles that don't come from the target. (I think standard running is unaffected.) CVS snapshot from 4 July 2005. -RPM. | 19 July, 2005 |